Become our customer
Self service portal E-manager
Information line 8900

Implementation of energy efficiency improvement measures for the apartment building at Kaņiera iela 4B, Riga (previous address – Maskavas iela 250 k-7, Riga)

On 23.05.2019, the association “M250/7” concluded a grant agreement with AS “Attīstības finanšu institūcija Altum”.

Total project costs: EUR 590 907.92 (applicable costs).

Altum grant: EUR 295 453.96

Project implemented: from 25.05.2019 to 09.01.2020.

Contractor – SIA “PRO DEV”, Author supervisor – Dace Ržepicka, Construction supervisor – SIA “Energo Rīga Serviss”, Project management – SIA “Rīgas namu pārvaldnieks”.

Project financed by AS “Swedbank”.

According to the energy audit, the renovation project and possible energy efficiency measures will result in heat energy savings of around 61.70%.

09.01.2020. Riga City Construction Board made an entry for the completion of construction works for the simplified renovation of the façade of the residential building at Kaņiera iela 4B, Riga.

13.01.2020. Riga City Construction Board made an entry for the completion of construction works of the internal water supply and sewage networks for the residential building at Kaņiera iela 4B (Maskavas 250 k-7), Riga.

15.01.2020. Riga City Construction Board made an entry for the completion of construction works of the heating system for the residential building at Kaņiera iela 4B (Maskavas 250 k-7), Riga.

Works performed within the project:

  • External wall insulation, façade with plaster
  • Replacement of windows and doors in common areas
  • Insulation of the basement and attic slab
  • Renovation of heating system, installation of individual meters
  • Renovation of the water and sewage systems
  • Foundation and base insulation, curb construction
  • Restoration of entrance awnings
  • Restoration of the balcony, etc.

The residential building at Kaņiera iela 4B, Riga, has 5 floors with 60 apartments and it was put into operation in 1966.


Before renewal: